स्याफ्रुबेँसी–खाम्जिङ
RASUWA, October 30:
A temporary wooden bridge connecting Syaprubesi in Rasuwa to various wards of Gosaikunda Rural Municipality—which was cut off following road networks being damaged by floods in the Bhote Koshi River—has come into operation. The temporary wooden bridge, constructed to ease the movement of local residents, has been brought into service starting Thursday.
According to Mingmar Chhiring Tamang, Ward Chairman of Gosaikunda Rural Municipality-3, the bridge was constructed over three continuous days under the joint leadership and management of the ward office and local residents after floods obstructed the road.
With the wooden bridge coming into operation, it has become much easier for local residents traveling to and from Khamjing in Gosaikunda Rural Municipality-3, Timure in Ward No. 2, and Langtang in Ward No. 4, Ward Chairman Tamang informed.
The bridge was built on the initiative of the ward office and local youth. The timber required for the bridge was collected locally.
—RSS
