Myagdi, Nov 29 :
Similarly, Raju Prasad Acharya, Chairperson of Jaljala Rural Municipality, drew Minister Shrestha’s attention to river control measures, resettlement of displaced residents, and construction of a bridge across the Kaligandaki River in the Pharse area, where an entire settlement was swept away by flooding from the Kaligandaki.
Minister Shrestha informed that budget sources have already been secured to move forward with river control work in the Beni area. He stated that an office has been established in Beni to protect vulnerable and flood-damaged settlements across the Kaligandaki basin, and that projects will be carried out through that office.
He remarked that because the floods caused unprecedented damage, managing resources for settlement protection and embankment construction projects has become challenging. He shared that funds received in the Prime Minister’s Relief Fund will be mobilized for reconstruction through the National Disaster Risk Reduction and Management Authority (NDRRMA).
Observing that this year’s disasters have made climate-resilient infrastructure development a mandatory prerequisite for progress, Minister Shrestha stated that the Electricity Regulatory Commission has undertaken a study on safeguarding the structures of hydropower projects under construction as well as those currently in operation.
He noted that flooding in the Bhotekoshi River caused severe damage not only to the energy sector but also to human resources. Sharing that international support and cooperation have been sought to address such disasters, he stated that constructing development infrastructure alone is not sufficient—ensuring its safety, sustainability, and the protection of citizens’ lives is equally vital.
RSS
