Ranjha (Banke), October 3 The construction of a concrete embankment on the Rapti River in Banke has...
Energy
Kathmandu, Sept 28: The Nepal Electricity Authority (NEA) has reported that 430 megawatts of electricity have been...
Lamjung, Sept 28: Two high-capacity hydropower projects of Lamjung district, which were closed from Sunday morning following...
Kathmandu, Sept 25: The 40-megawatt Rahughat Hydropower Project has been connected to the national transmission system. Raghuganga...
Humla, Sept 22: The rock fall onto the Karnali Corridor at Rip of Sarkegad Rural Municipality-2 has...
Kathmandu, Sept 19: Electricity worth over Rs 5.09 billion was exported during the month of Bhadra. According...
Kathmandu, Sept 9: The work to restore the electricity connection disrupted due to the flood in Rasuwa’s...
Narayan Adhikari Chitwan, Sept 5: In a bid to avert shortage of cooking LP gas in the...
The mudslide in Rasuwa killed people. It destroyed homes. It washed away roads and bridges along the...
