Birgunj, Sept 13: Road Division Office is gearing up to wrap up the road widening project by...
Infrastructure
Kathmandu, Sept 9: The work to restore the electricity connection disrupted due to the flood in Rasuwa’s...
Kathmandu, Sept 6: The recent flood in the Bhotekoshi River has severely impacted 55 drinking water projects...
Rasuwa, Sept 5: The flood in Bhotekoshi has caused massive damage to both private and public property...
The mudslide in Rasuwa killed people. It destroyed homes. It washed away roads and bridges along the...
Kathmandu, Sept 3: Floods and landslides triggered by recent heavy rains have caused significant disruption in traffic...
