HUMLA, October 1. Unceasing rainfall followed by landslides, floods, and falling boulders has completely halted vehicular movement...
Infrastructure
WEST, October 1 Member of the House of Representatives, Dr. Anand Bahadur Chand, has urged authorities to...
DARCHULA, October 1 A newly constructed suspended bridge over the Ojigad River in Hunainath, Ward No. 4...
Narayangadh (Chitwan), October 1 The Chepang Highway, a 66-kilometer road connecting Bhandara in Chitwan along the East-West...
Gulmi, October 1 The Kali Gandaki Corridor, which was previously blocked due to heavy rainfall, has resumed...
MYAGDI, September 30 The Beni–Babiyachaur road section has reopened for traffic after remaining obstructed for four days...
Kathmandu, September 30 The government has initiated alternative management efforts after disastrous flooding in Rasuwa’s Bhote-Koshi River...
Ranjha (Banke), October 3 The construction of a concrete embankment on the Rapti River in Banke has...
BAGLUNG, October 30 Continuous rainfall from September 25 to 27 has severely affected the Nisikhola and Tamankhola...
Rasuwa, September 29 The repair and construction of the foot trail connecting Yangyang Khola to the Tuin...
