दोधारा चाँदनी झोलुङ्गे पुल
Mahendranagar, Nov 13:
Hotel businesses on both sides of the bridge have collapsed following the suspension of movement due to the collapse of the Dodhara Chandani suspension bridge.
Following the damage to the bridge connecting Dodhara Chandani and Bhimdutt Municipality caused by floods in the Mahakali River during the second week of Asoj, the arrival of domestic and foreign tourists for sightseeing has steadily declined in the area.
“It feels as though a lock has been placed right over our mouths after one of the bridge’s pillars collapsed,” said hotel entrepreneur Mohan Bahadur Singh. “The local administration has locked both sides of the bridge. With movement completely halted, our trade and businesses have fallen into ruin.”
After the bridge collapsed, a technical team submitted a report estimating that reconstruction would cost NPR 200 million and take one year to complete.
“During Dashain and Tihar, tourist arrivals used to be massive, and that period accounted for our earnings of the entire year,” Singh added. “People still come via the four-lane bridge to look at the suspension bridge, but the environment to view it is not ready.”
He noted that because it is shorter in distance, two-wheelers and local pedestrians from Dodhara Chandani used to rely on the suspension bridge. “The water level in the Mahakali River has dropped. I wish the government would start building the bridge now,” Singh said.
“Until the bridge is built, businesses on both sides remain hopeless. I used to earn NPR 8,000 to 10,000 daily, but now it has completely stopped.”
Similarly, Ramchandra Bohora, Ward Chair of Bhimdutt Municipality-13, stated that the suspension bridge—which usually teems with life during festivals—remained deserted this time. “During Dashain and Tihar, two to three thousand tourists used to visit daily for sightseeing,” Ward Chair Bohora said.
“During winter, educational excursions used to bring good business to this area. The bridge remaining closed has created widespread negative impacts.” He emphasized that immediate initiatives must be taken to reconstruct the bridge.
“When the bridge collapsed, everyone from people’s representatives to politicians came here to take stock of the situation,” Bohora noted, “but on the ground, there is no sign of reconstruction work beginning.” The Sudurpashchim Provincial Government has allocated NPR 10 million for the reconstruction of the bridge.
Meanwhile, Dinesh Malla, President of the Kanchanpur Chamber of Commerce and Industry, stated that bridge reconstruction must be advanced immediately. He pointed out that the Dodhara Chandani bridge is not just a route for easy transit, but a well-known tourist destination in Kanchanpur.
“If the bridge is not built in time, tourist arrivals here will drastically decline,” President Malla warned. “Quick reconstruction of the bridge is also essential for tourism promotion.”
RSS
