KATHMANDU, October 27 — The Department of Hydrology and Meteorology, Weather Forecasting Division has issued a major...
Infrastructure
Myagdi, Oct 27: Residents of Beni Bazaar, the district headquarters of Myagdi, are facing a shortage of...
Gorkha, Oct 27: The flood occurred on October 11 from the Budhigandaki River after an avalanche blocked...
Kathmandu, October 26: The overhead bridge currently under construction at Babarmahal in Kathmandu is set to come...
Government plans to lower water levels in four high-risk glacial lakes, introduce AI-powered weather forecasting and strengthen...
Washington, October 26:German carmaker Audi plans to invest $4.2 billion to build its first factory in the...
Kathmandu, Oct 25: The Tamang heritage trail situated in Rasuwa district and the Ruby valley trail located...
Rasuwa, Oct 25: Authorities have speeded up a process to install a bailey bridge at Syafrubensi. The...
Baitadi, Oct 25: A 4.2 magnitude earthquake occurred in Baitadi with its epicentre at Airigaon in the...
Myagdi, Oct 25: Power supply has been restored in all areas affected by floods and landslides in...
